【For the construction industry】Kakubuta Bridge Pon! Metal Kit
Bridge construction in as little as one day! Achieving shortened construction time and cost reduction.
In the construction industry, shortening the construction period for bridge projects is essential for cost reduction, minimizing the impact on the surrounding environment, and improving overall project efficiency. Traditional methods have faced challenges such as long on-site work periods that are easily affected by weather and surrounding conditions. The Kadofuta Bridge Pon! Metal Kit significantly reduces the construction period by simply joining factory-manufactured panel units on-site. Its low girder height structure also allows for the reuse of existing substructures, contributing to cost savings. 【Application Scenarios】 - Bridge replacement - Repair of aging bridges - Bridge construction in narrow areas 【Benefits of Implementation】 - Significant reduction in construction period - Cost savings - Suppression of noise and vibration - Reuse of existing substructures - Feasible construction in narrow areas
- Company:日鉄エンジニアリング 都市インフラ営業本部
- Price:Other